From Late-Stage Assurance to Immersive Testing: Designing a Human Factors (HF) Lab to Test Future Rail Infrastructure

Authors

  • Chuah Yi Ning

DOI:

https://doi.org/10.26686/nzjhsp.v3i4.11870

Keywords:

Human-Centric Design, rail infrastructure, virtual reality, modelling

Abstract

In the past, human factors (HF) in infrastructure projects was often applied later through design reviews and standards-based checks after important design decisions had been made. As transport systems become more complex, HF practice is moving toward earlier, more immersive, and more evidence-based testing of designs before infrastructure is built.

This presentation describes the development of a HF Lab Implementation Plan for a large transport infrastructure project. The plan was developed through document review, workshops, analysis of users and key activities, and a targeted literature review. HF lab methods and tools were assessed using a rating framework covering both the robustness of evidence for measuring design against success outcomes and whether each method was fit-for-purpose for the project and Human Centred Design (HCD) topic area.

Downloads

Published

2026-11-18

Issue

Section

HFESNZ conference abstracts or articles

How to Cite

Yi Ning, C. (2026). From Late-Stage Assurance to Immersive Testing: Designing a Human Factors (HF) Lab to Test Future Rail Infrastructure . New Zealand Journal of Health and Safety Practice, 3(4). https://doi.org/10.26686/nzjhsp.v3i4.11870